Sealing

Constructed wetlands must be sealed at the bottom and sidewalls to avoid any groundwater pollution. As natural sealing there are different recommendations as shown in the following table:





SWAMP 2002

DWA 2004 Germany

Permeability coefficient kf

< 10-7 m/s

< 10-8 m/s

Thickness of sealing

> 30 cm

> 60 cm

Table 4: Recommendation for natural sealing of Constructed wetlands



If natural soil is not available, an artificial layer with impermeable layer is required. The material should be acid resistant and alkali proof, frost and UV resistant, root and rodent resistant, non toxic, easy to carry and move and preferably made of recyclable materials (preferred HDPE or LDPE).



Construction and sizing of the bed

The design criteria for HSF Constructed wetlands can be seen in the table below;







Criteria

Germany, DWA 2004

US EPA 2000

EC Guidelines CEMAGREF

United Kingdom, Cooper 1996

Surface area

5 m2/pe

minimum size 20 m2



5 m2/pe for BOD > 300 mg/l, otherwise 10 m2/pe

5 m2/pe**

0.5-1 m2/pe***

Hydraulic surface load

40 mm/d





< 50 mm/d**

< 200 mm/d***

Max organic load

BOD: 8 g/(m2*d)*

BOD: 6 g/(m2*d)





Depth

0.5 m





0.6 m

Table 5: Design criteria for horizontal flow submerged beds (HSF)

* calculated with 40 g BOD/(PE*d)

** for secondary treatment

*** for tertiary treatment



Apart from those specified in the presented guidelines, Rousseau et. al. (2004) performed a review concerning different design methods. In general, the rules of thumb suggested by several works can be served as a safe bed. However the investment costs tend to be higher due to conservative aspects of this approach.



For the vertical subsurface-flow type, the design criteria are shown below;



Criteria

Germany, ATV 2004,

Lange & Otterpohl 1998

EC Guidelines CEMAGREF

United Kingdom, Cooper 1996

Surface area

4 m2/pe

minimum size 16 m2

1-2 m2/pe for greywater

5 m2/pe for BOD > 300 mg/l, otherwise 10 m2/pe

5 m2/pe**

0.5-1 m2/pe***

Hydraulic surface load

80 mm/d





< 50 mm/d**

< 200 mm/d***

Max organic load

COD: 20 g/(m2*d)







Depth

0.5 m





0.6 m

Table 6: Design criteria for vertical subsurface-flow Constructed wetlands (VSF)

** for secondary treatment

*** for tertiary treatment